A Process Framework for Increasing the Probability of Project Success

Glen B. Alleman at Herding Cats have blogged about A Process Framework for Increasing the Probability of Project Success.

  • The cost estimates for the project and the basis of estimate for those costs. The customer wants to know how much the product or service will cost

  • A Work Breakdown Structure describing the products and their components to be delivered and the work process needed to deliver those products

  • An Organizational Breakdown Structure describing who is participating in the project

  • A Responsibility Assignment Matrix that connects the participants in the project with the deliverables of the project and identifies who is accountable for each deliverable

  • An Integrated time-phased plan and master schedule showing the flow of increasing maturity of the deliverables and the sequence of work needed to produce each deliverable to its planned level of maturity

  • A Work Authorization and Control Account process to allocate funding, control expenditures, and assure budget control of the project

  • A means of accumulating costs from each work activity (Work Package)

  • Analysis of the cost, schedule, and technical performance measures of the project

  • A set of management actions that use the analysis information

  • Baseline Change Control processes to maintain the integrity of all commitments of the project

  • Training needed to perform the processes

  • Surveillance needed to assure the process are being applied correctly and the expected benefits from these process are being delivered to the project


What form each of these processes takes is project and method dependent. But in the absence of some form of these processes, the probability of success is reduced.





Follow my daily antics, links, tips and more @rajneeshgarg on Twitter!




Bookmark and Share

Comments

Popular posts from this blog

Installing Bugzilla on Windows

Bugzilla is the Bugs/Issues Tracking Tool from The Mozilla Organization. Version 2.18 is the latest stable release. There are couple of resources which guide a User installing Bugzilla on a Unix/linux machine. However, this entry describes a way to install Bugzilla on a Windows machine (W2K to be precise). This document guides you step by step through the installation process. First, get Administrative access to the machine on which you want to install Bugzilla. It should be a simple step. Usually, Users are given Administrative rights on Windows machine. However, if you dont have, contact your Administrator. Get Bugzilla Then download the Bugzilla from http://bugzilla.org/download.html . There are two ways of gettng it - through CVS or direct downloading the tar file. Remember there are no Zip files. However, any zip utility should be able to untar the Bugzilla. I download the tar file and untarred it using WinZip. I placed the untarred 'bugzilla' directory in my c: drive. So...

JSP Performance Tips

Here are a few tips to improve JSP performance that I have been using. If you have your own listing of the tips, plz share. Disable JSP auto reloading feature. Use thread pool for your JSP engine and define the size of thread pool as per application requirement. Use jspInit() method to cache static data Initialize the 'out' object (implicit object) with proper size in the page directive. Set the content length Give 'false' value to the session in the page directive to avoid session object creation. Flush the data partly Use StringBuffer rather than using + operator when you concatenate multiple strings Use include directive instead of include action when you want to include the child page content in the translation phase. Avoid giving unnecessary scope in the 'useBean' action. Use print() method rather than println() method Use ServletOutputStream instead of JSPWriter to send binary data Minimize code in the synchronized block Do not use custom tags if you do no...

How old are the daughters?

Two MIT math graduates bump into each other at Fairway on the upper west side. They hadn't seen each other in over 20 years. The first grad says to the second: "how have you been?" Second: "Great! I got married and I have three daughters now" First: "Really? how old are they?" Second: "Well, the product of their ages is 72, and the sum of their ages is the same as the number on that building over there.." First: "Right, ok.. oh wait.. hmmmm.., I still don't know" second: "Oh sorry, the oldest one just started to play the piano" First: "Wonderful! my oldest is the same age!" Problem: How old are the daughters?